NAVIGATOR INVESTLLC

Oil and natural gas production

Banner Background

FIELD SURVEY

YARMAKIVSKE OIL FIELD

General overview

Location: Poltava region, Myrhorod district
Area: 78 sq. km
Licensee: Soyuz-Budresursy LLC
Operator: Navigator Invest LLC
Special permit: until 14.01.2041

01

General overview

Geological structure

Yarmakivske Oil field
Pavelkovske structure
Eastern Yarmakivska structure (1 and 2)
Eastern Kybyntsivska structure
Southern Kybyntsivska structure

02

Geological structure

3D seismic survey

In 2012-2013, 3D seismic exploration was conducted across the entire licensed area.

Based on the interpretation of the 3D seismic data, tectonically and lithologically traps were identified: East-Kybynetska, South-Kybynetska, Yarmakivska, East-Yarmakivska and Pavelkivska.

The prospective depth interval is 1800-3800 meters.

In 2025, the 3D seismic data was reprocessed and reinterpreted.

03

Reinterpretation

Reserves / Prospective resources

In 2024, materials on the geological and economic assessment of the reserves of the Yarmakivske field were re-prepared and submitted to the State Committee for the Conservation of Mineral Resources of Ukraine. As a result of the complete reassessment, the hydrocarbon reserves were approved by the State Committee for the Conservation of Mineral Resources of Ukraine Protocol No. 5739.

04

Development plan

The field development plan provides for the drilling of 8-10 exploration and production wells.

05

Development plan

The field development plan provides for the drilling of 8-10 exploration and production wells.

About Us

LLC "NAVIGATOR INVEST" FUEL AND ENERGY COMPLEX ENTERPRISE

The main activity of the company is oil production at the wells of the Yarmakiv oil field.

 

The company provides raw materials to domestic oil refineries, which is of great importance for the energy sector of the national economy of Ukraine.

About Us Image

0

New wells drilled

0

Well is under conservation

0

Complex oil preparation plant (CUP) was built

0

Over 6km of paved roads and power lines have been constructed

0

3D seismic data reprocessed and reinterpreted

Invest in energy with a future today - oil, gas, technology and profit.

Get In Touch

Benefits

Principles of operation

Reliability icon

Reliability

We ensure stable and uninterrupted production and supply of energy resources, adhering to high quality standards and responsibility to partners, consumers, and society.

Innovations icon

Innovations

We implement modern technologies and digital solutions that increase production efficiency, optimize processes, and open up new opportunities for sustainable development.

Environmental responsibility icon

Environmental responsibility

Preserving the environment is one of our priorities. We minimize our impact on nature, adhere to environmental standards, and implement environmentally safe technologies.

Security icon

Security

We create safe working conditions for every employee. Compliance with occupational health and safety standards, preventive measures, and modern control systems are the foundation of our safety culture.

History

Events and Achievements

  • 2010

    3D seismic studies were carried out, based on the results of which the "Project of prospecting and exploratory drilling for oil and gas on Yarmakoska area" was compiled

    2010

    3D seismic studies were carried out, based on the results of which the "Project of prospecting and exploratory drilling for oil and gas on Yarmakoska area" was compiled

  • 2012 - 2013

    3D seismic surveys of Yarmakovska area were conducted by Vikoil LLC

    2012 - 2013

    3D seismic surveys of Yarmakovska area were conducted by Vikoil LLC

  • 2013

    Exploratory well No. 2 was drilled to a depth of 2,554 m; perforating the B-26 horizon between 2408 m and 2417 m, yielded a gushing inflow

    2013

    Exploratory well No. 2 was drilled to a depth of 2,554 m; perforating the B-26 horizon between 2408 m and 2417 m, yielded a gushing inflow

  • 2013

    Exploratory well No. 3 was drilled to a depth of 2,565 m; drilling was then suspended, and the well is currently in conservation

    2013

    Exploratory well No. 3 was drilled to a depth of 2,565 m; drilling was then suspended, and the well is currently in conservation

  • 2014 - 2015

    Oil treatment facilities (UKPN) were installed; two paved access roads to wells No. 2, No. 3 and No. 5 totaling over 6 km were constructed; and power lines were constructed.

    2014 - 2015

    Oil treatment facilities (UKPN) were installed; two paved access roads to wells No. 2, No. 3 and No. 5 totaling over 6 km were constructed; and power lines were constructed.

  • 2015

    Well No. 2 was placed into trial operation on the B-26 horizon, employing a mechanical screw pump

    2015

    Well No. 2 was placed into trial operation on the B-26 horizon, employing a mechanical screw pump

  • 2017

    On November 23, the Agreement on Joint Investment Activities was signed

    2017

    On November 23, the Agreement on Joint Investment Activities was signed

  • 2018 - 2019

    As part of the joint activity between SOYUZ-BUDRESURSY LLC and NAVIGATOR INVEST LLC for drilling well No. 5, the initial flow rate was 15 cubic meters per day

    2018 - 2019

    As part of the joint activity between SOYUZ-BUDRESURSY LLC and NAVIGATOR INVEST LLC for drilling well No. 5, the initial flow rate was 15 cubic meters per day

  • 2019

    A geological and economic assessment (GEO) of the Yarmakov deposit was completed

    2019

    A geological and economic assessment (GEO) of the Yarmakov deposit was completed

  • 2021

    A new special permit (license) for the hydrocarbon production was granted for a 20-year term, valid Jan 14, 2041

    2021

    A new special permit (license) for the hydrocarbon production was granted for a 20-year term, valid Jan 14, 2041

  • 2021 - 2022

    A new oil deposit B-19 was discovered. Its commercial value was established, and it was put into trial production with Well No.2. The initial oil flow rate ranged from 17 to 47 cubic meters per day.

    2021 - 2022

    A new oil deposit B-19 was discovered. Its commercial value was established, and it was put into trial production with Well No.2. The initial oil flow rate ranged from 17 to 47 cubic meters per day.

  • 2024

    A new Geological and Economic Assessment (GEO) of the Yarmakovsky deposit was completed, and the reserves were evaluated and registered with the State Reserves Committee (GKZ)

    2024

    A new Geological and Economic Assessment (GEO) of the Yarmakovsky deposit was completed, and the reserves were evaluated and registered with the State Reserves Committee (GKZ)

  • 2024

    Re-evaluation of the Yarmakivske field reserves (refinement of reserves in the B-26 and B-19 horizons, identification of new productive formations based on well logs within the license area). The hydrocarbon reserves were approved by the Protocol of the State ReservesCommittee of Ukraine No. 5739

    Re-evaluation of the Yarmakivske field reserves (refinement of reserves in the B-26 and B-19 horizons, identification of new productive formations based on well logs within the license area). The hydrocarbon reserves were approved by the Protocol of the State ReservesCommittee of Ukraine No. 5739

  • 2025

    Drilling of Well No. 10 was completed to a total depth of 2,600 meters, at which point the fm1 horizon of Devonian formation was intersected

    2025

    Drilling of Well No. 10 was completed to a total depth of 2,600 meters, at which point the fm1 horizon of Devonian formation was intersected

To Investors

About the investment attractiveness of the company

Інвесторам

Navigator Invest LLC is an independent oil extraction company operating in Eastern Europe. We are currently seeking a strategic investment partner to jointly develop an operating oil field located in Central Ukraine.

We are offering a co-investment opportunity into an existing, licensed operation with strong development potential and infrastructure already in place.

  • Ready asset

    Fully operational oil field with full infrastructure

  • License until 2041

    License valid until 2041, with the possibility of extension

  • Convenient location

    Strategically located in a highly prospective area

OVERVIEW OF OIL ESTIMATED RESERVES AND RESOURCES

3 887 th. tonnes

Total oil reserves and resources

582 th. tonnes

Balance reserves

795 th. tonnes

Reserves requiring further testing

2 510 th. tonnes

Prospective resources

Partnership

Our company has already conducted 3D seismic analysis and assembled a highly skilled team of geologists, drilling specialists, infrastructure engineers, and developers. However, to fully realize the field’s potential, we are looking for a co-investor to join us in the development phase. While we bring strong technical and operational capabilities, additional capital is needed to scale operations and accelerate production.

We invite you to consider this opportunity and would be happy to share further documentation, technical reports, and licensing details. Please let us know if you would be open to a meeting or call to explore this further.

Download report
Інвесторам

Documents

Contracts and Permits

  • Special permit SOYUZ-BUDRESURSY LLC Yarmakivske deposit

    Download
  • Oil and gas production agreement Yarmakovske

    Download
  • Protocol of the State Reserves Committee of Ukraine No. 5739

    Download
  • Agreement on Joint Investment Activities as amended in 2021

    Download